The leader in industrial automation and control solutions

Sample Project Description

In this tutorial, you’ll learn how to connect a Maple Systems HMI to an OPC UA setup. We’ll cover project initialization, importing OPC UA tags into an HMI project, and connecting your HMI to OPC UA as both a client and as a server.

Required Software

Ensure you have the necessary software and version installed to use this sample project correctly.

  • Software Name: EBPro
  • Minimum Software Version: EBPro v6.10.01.510

Sample Project File(s)

Download the project files in .zip format. Extract the contents before using them in the required software.

Other Sample Projects